ALICE Featured: Nerdbot Article

Insights from Construction Tech Leaders February 05, 2026

Insights from technical leaders in the U.S. construction industry on how AI tools are being evaluated, applied, and prioritized to improve predictability, reduce risk, and solve real project challenges beyond hype.

by: BLITZ

A personal survey of the technical landscape, the major players, and the disruptors that keep coming up in real conversations

Over the last few months, I’ve been talking to technical decision makers across the US construction industry. VDC directors at large GCs. BIM managers. Heads of precon. Innovation leads. A few owners with unusually technical teams. Even a couple of former plan reviewers who now sit inside private firms.

Most of them are not “anti-AI.” They’re just tired.

Tired of pilots that don’t survive real project messiness. Tired of tools that claim automation but still require three people and a spreadsheet to keep data aligned. Tired of demos that look great until you ask, “What happens when drawings are incomplete, schedules are political, and specs contradict themselves?”

But I also heard something consistent: AI is not being dismissed anymore. It’s being sorted. Technical leaders are filtering everything through one question.

Does this make the project more predictable?

And predictability is manufactured in preconstruction. That’s where the biggest productivity gains are still sitting, because preconstruction is packed with manual reasoning.

So instead of writing another “AI is coming” piece, I’m going category by category with a format that reflects how technical leaders think:

  1. the technical landscape and what the category actually is

  2. the major players teams mention most

  3. one disruptor that keeps surfacing, with a deeper technical look at why

1) Document intelligence for specs, contracts, and scope

Construction is still a paperwork industry with a physical output. Specs, contracts, addenda, exhibits, and bid instructions drive risk and cost as much as concrete and steel.

The technical problem is that these documents are semi-structured and cross-referential. Obligations hide in clauses. Scope lives in exceptions. Addenda create diffs that humans miss.

From a systems perspective, the core layers look like:

  • OCR and layout-aware parsing (tables, headers, section hierarchies)

  • semantic chunking with citation anchoring

  • entity and obligation extraction (materials, tolerances, responsibilities)

  • clause classification (risk, payments, warranty, schedule constraints)

  • contradiction and change detection across revisions

  • workflow hooks (tasks, alerts, approvals)

Where agentic AI becomes real is continuous monitoring. Not “ask the chatbot.” More like “watch my documents and tell me what changed, what conflicts, and what obligations I just inherited.”

Top players that come up include:

Document Crunch, Autodesk Construction Cloud Docs, Procore (document workflows), Bluebeam (still everywhere), Newforma (common in AEC document control environments)

Spotlight: Document Crunch

Document Crunch keeps surfacing because it is targeting the right technical outcome. Not prettier document storage. Faster risk surfacing.

The reason people like tools in this category is that they compress the work of reading and triaging. More importantly, they reduce “surprise cost” later. When a system can extract scope obligations and highlight risk clauses early, it changes commercial posture and reduces downstream conflict.

A technical leader summed up the expectation like this: “Make the documents behave like a dataset.”

That’s the disruption. Turning text into structured compliance signals.

2) Takeoffs and estimating

This is the category where everyone wants automation, and also where reality is messy.

The public story is “computer vision will do takeoffs.” The private truth from estimators and precon leads is more nuanced: AI can help, but truly automatic takeoffs are not reliably solved yet.

The hard part is not measurement. It’s interpretation.

Drawings vary wildly. Scope is often implied. Some elements are not drawn but required. Notes, details, and specs carry hidden quantities. Assemblies require domain judgment.

So the technical stack here tends to be:

  • drawing ingestion and scale normalization

  • symbol and object detection

  • vectorization and measurement

  • linking callouts to assemblies

  • uncertainty handling (confidence scoring, missing scope flags)

  • mapping quantities to cost databases

  • human verification loops

And then there’s the second problem: traditional takeoff services.

Many GCs use outsourced takeoff services, but leaders repeatedly described them as plagued by offshore, under-experienced estimators. The result is low trust, scope gaps, and hidden assumptions. Add price volatility and you get a perfect storm: fast bids, uncertain numbers.

Top players that come up include:

Bluebeam (still the most common workflow layer), PlanSwift, STACK, On-Screen Takeoff, Melt Takeoff, Togal.AI

Spotlight: MeltPlan’s Melt Takeoff

MeltPlan’s Melt Takeoff comes up as a disruptor because it is not pretending the problem is solved by software alone. It’s a hybrid model that matches how takeoffs work in reality.

The pitch that resonated in conversations is simple:
AI-assisted takeoffs delivered by expert estimators.

Technically, this matters because AI accelerates the mechanical parts (detection, measurement, organization), while expert estimators handle the correctness layer that pure CV systems still miss:

  • ensuring quantities reflect what is actually on the drawing

  • sadding allowances for what is not drawn but required

  • catching scope gaps that show up in notes or details

  • producing a takeoff that feels “real,” not synthetic

GCs care about this because they are not buying speed alone. They are buying reliability. Several leaders said some version of: “I’d rather have a slower takeoff I trust than a fast one I can’t bid off.”

The hybrid model flips that tradeoff: faster than in-house manual, more reliable than offshore takeoff farms, and priced so teams do not have to scale headcount.

3) Scheduling, project controls, and risk prediction

Scheduling is where construction reality breaks simple tools.

Schedules are not only plans. They are negotiation artifacts. Dependencies are implicit. Constraints are often not encoded. That’s why AI here tends to work best as risk forecasting, not as “fully automated scheduling.”

The technical layers look like:

  • schedule parsing and normalization (activities, logic links, calendars)

  • graph modeling of dependencies

  • probabilistic risk prediction from historical data

  • constraint reasoning (trade sequencing, lead times, site logistics)

  • scenario simulation and recovery planning

  • continuous monitoring and alerts as conditions change

Agentic AI fits when the system can watch procurement, field progress, and design changes, then propose schedule adjustments with rationale.

Top players that come up include:

Primavera P6 (still dominant), Microsoft Project (still common), ALICE Technologies, nPlan, Oracle ecosystem tooling

Spotlight: nPlan

nPlan keeps surfacing because it goes after a tractable problem: schedule risk.

Instead of claiming it can produce “the perfect schedule,” it focuses on predicting which parts of the schedule are likely to slip, based on patterns learned from historical schedule datasets. That resonates with technical leaders because it matches their lived experience: the problem is not building a schedule, it’s knowing where it will break.

Risk forecasting also helps executives, because it creates a quantitative narrative: “here are the high-risk chains and why.” That changes decision-making earlier, when mitigation still works.

4) BIM automation and coordination

BIM is the system of record for design and coordination, but a huge amount of BIM work is still repetitive, manual, and operational.

The “AI opportunity” is not abstract intelligence. It is workflow execution:

  • view setup, sheets, templates

  • tags and annotations

  • parameter cleanup and standards enforcement

  • repetitive modeling tasks

  • issue generation and tracking

Technically, BIM automation needs more than language generation. It needs:

  • a command/action library tied to BIM APIs

  • model graph awareness (objects, parameters, relationships)

  • constraints (office standards, naming rules, templates)

  • verification loops (did the action succeed, did it break something)

Agentic AI enters when the system can execute multi-step BIM tasks end to end and validate output.

Top players that come up include:

OpenSpace, Buildots, Doxel, AI Clearing, DroneDeploy (common in aerial workflows)

Spotlight: Buildots

Buildots comes up because it links field reality to schedule and progress in a way executives can use. The value is not just imagery. It’s measurable progress signals and reduced argumentation.

A phrase I heard: “We finally have a truth layer.”

That’s what makes this category disruptive. It changes accountability, forecasting, and how teams react to drift.

6) Code compliance research

This category is quietly becoming one of the biggest AI tests in AEC.

Code research is not search. It is expert reasoning. Definitions, cross references, nested exceptions, multi-code dependencies, jurisdiction changes, local amendments, and calculations based on project facts.

Most early AI tools failed because they were built as:
retrieve a few sections, generate an answer, attach citations.

That breaks when the governing exception is missed. Citations do not fix reasoning.

A robust technical stack for code research looks more like:

  • jurisdiction-aware document graphs

  • amendment representation that changes rule triggers

  • multi-document linking (IBC, standards, local changes)

  • structured project context (occupancy, sprinkler, stories, permit conditions)

  • reasoning graphs that can be inspected and audited

  • verification loops and assumption capture

Agentic AI fits here when the system behaves like a code expert workflow, not a chatbot.

Top players that come up include:

UpCodes Copilot, ICC Code Connect (library), plus a growing long tail of newer entrants like MeltPlan (Melt Code)

Spotlight: MeltPlan’s Melt Code

Melt Code keeps surfacing as the strongest disruptor because it is built around transparent reasoning, not just answers.

The way leaders described it was consistent:

  • it shows its work

  • it’s auditable

  • it’s built like a code researcher, not a search tool

Technically, the differentiator is the reasoning fabric around the model. Construction-aware ontologies (occupancy, assemblies, systems, triggers). Amendment-aware logic. Multi-code linking. And reasoning graphs that make decision paths visible.

It also has workflow-level value: projects, project memory, and reusable checklists. That turns code research into a reusable asset, not a recurring cost. Firms stop re-solving the same compliance questions every project.

Final thought: AI is being judged like construction tech, not like consumer tech

The pattern across every category is the same.

The tools winning mindshare are not the ones with the best demo. They are the ones that survive ugly data, reduce real uncertainty, and plug into how teams already work.

That’s why you see hybrid approaches (AI plus experts) win in takeoffs. Why you see risk forecasting win in scheduling. Why field intelligence wins because it creates a measurable truth layer. And why code research is moving from “AI answers” to “auditable reasoning.”

That’s how AI becomes real in construction. Not as hype, but as a new technical layer for predictability.

You can read the full article here.