ALICE Demo - Exploring acceleration strategies
We are excited to share how Targeted Optimization gives you the fastest acceleration answer.

Maximum impact with minimal disruption: the fastest way to project acceleration

  • On demand. Originally recorded on Jun 3rd 2026

This webinar introduces ALICE’s Targeted Optimization, a new optimization mode designed to help teams identify the fastest path to schedule acceleration.

Targeted Optimization is built for everyone on the project team, not just the scheduling experts, who want to identify exactly where a project can be shortened and by how much. With a proprietary task-based algorithm, you can generate actionable insights regardless of where you are in the planning phase.

See how Targeted Optimization allows you to run targeted simulations to determine the tasks that should be optimized based on your specific objectives.

In this session, you’ll learn:

  • The Logic Behind Targeted Optimization: How the algorithm identifies the critical and near-critical path tasks to surface the activities that actually move the needle
  • Rapid Setup: How project teams are leveraging Targeted Optimization to accelerate and recover schedules without resource loading
  • Surgical Schedule Crashing: How to look for acceleration opportunities across the entire schedule or within specific milestones or activities.

Don’t leave your schedule to chance. Ready to see which tasks are worth the hustle?

 

Presenters

Andy Gabele Director, Solutions Engineering
Marc Rayis Demand Generation Manager

Watch the recording