---
title: "Fireside chat with ALICE Customer: SCS JV"
description: In this session, you'll learn how SCS JV leveraged ALICE's generative construction platform to realize £2 million (USD 2.5M) in cost savings on the project.
---

[Events and Webinars | ALICE Technologies ](https://blog.alicetechnologies.com/events-and-webinars)

# [Fireside chat with ALICE Customer: SCS JV](https://blog.alicetechnologies.com/events-and-webinars/fireside-chat-how-scs-jv-utilized-alice)

 Written by [ALICE Technologies](https://blog.alicetechnologies.com/events-and-webinars/author/alice-technologies) | Sep 2, 2023 4:51:33 AM

 

### **On the fast track to savings - How SCS JV utilized generative construction tech for efficient rail construction**

Three major European general contractors – Skanska, Costain, and STRABAG – formed a joint venture, SCS JV, to optimize the construction of the London tunnels of HS2, a national high-speed railway linking London, Birmingham and the north of the country. SCS JV is constructing 13 miles of twin-bore tunnels on the HS2 route, terminating at Euston station in central London.

 

In this session, you'll learn how SCS JV leveraged ALICE's generative construction platform to realize £2 million (USD 2.5M) in cost savings on the project.

**Topics covered:**

- **The Challenges**: Understand the complexities of the twin-bore tunnels on the HS2 project and how the project has been scoped, planned and managed by SCS JV. 
- **The Partnership**: Learn about the collaboration between SCS JV and ALICE Technologies that made it possible to reduce costs so significantly. 
- **The Future**: Explore what this case study means for the future of tunnels and railway construction, as well as capital infrastructure projects worldwide.

 

[View full post](https://blog.alicetechnologies.com/events-and-webinars/fireside-chat-how-scs-jv-utilized-alice)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "ALICE Technologies"
  },
  "dateModified" : "2026-02-26T06:32:37.238Z",
  "datePublished" : "2023-09-02T04:51:33Z",
  "headline" : "Fireside chat with ALICE Customer: SCS JV",
  "image" : {
    "@type" : "ImageObject",
    "height" : 315,
    "url" : "https://8469043.fs1.hubspotusercontent-na1.net/hubfs/8469043/post-webinar%20opt%201%20%283%29.png",
    "width" : 573
  },
  "mainEntityOfPage" : "https://blog.alicetechnologies.com/events-and-webinars/fireside-chat-how-scs-jv-utilized-alice",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Events & Webinars"
  }
}
```