The ALICE Blog | The Latest on AI in the Construction Industry

The Future of Building Bytes: Emerging Trends in Data Center Construction

Written by Alex Teplitxky | Aug 30, 2023 8:19:00 PM

In today's digital world, the importance of reliable, efficient, and secure data centers has never been more critical. As tech companies continue to expand their digital infrastructure to meet increasing demand, the methods and strategies for constructing these indispensable facilities are also evolving. Here are some key trends shaping the future of data center construction:

 

  1. Sustainability and Green Building Practices

With a growing global focus on environmental responsibility, sustainable construction practices are becoming standard in the data center industry. This trend includes incorporating renewable energy sources, using energy-efficient building materials, and optimizing HVAC systems for maximum efficiency. Some data centers are even utilizing their excess heat to warm local communities, thus transforming a waste product into a resource.

 

  1. Modular and Prefabricated Construction

Modular and prefabricated construction methods, where components are built off-site and then assembled on location, are gaining popularity in data center  projects. These methods not only speed up construction times but also enhance quality control, as components are built in controlled environments. This approach also allows for scalability, with companies able to add or remove modules as their data needs evolve.

 

  1. Edge Data Centers

The global market for edge data centers is expected to nearly triple to $13.5 billion in 2024 from $4 billion in 2017, thanks to the potential for these smaller, locally located data centers to reduce latency, overcome intermittent connections and store and compute data close to the end user.

 

  1. AI-Driven Facility Management

The use of Artificial Intelligence (AI) for facility management is revolutionizing data center operation. AI and machine learning algorithms are being used to optimize power and cooling systems, predict maintenance needs, and even improve physical security. This trend also extends to construction, where AI tools like ALICE Technologies' generative construction platform can optimize the build process, minimizing costs and maximizing efficiency.

 

  1. Increased Security Measures

Data breaches can have catastrophic consequences, so ensuring physical security during construction is crucial. This trend is leading to innovative construction techniques to enhance security, from blast-resistant structures to biometric access controls.

 

As we look to the future, it's clear that the process of data center construction will continue to improve, driven by advances in technology and a growing global need for digital services. By staying abreast of these trends, construction professionals can ensure they are ready to meet the demands of this rapidly evolving sector.