title: Top contractor leverages ALICE to mitigate potential schedule delays and drive substantial savings on solar farm project
description: Discover how a solar general contractor utilized ALICE to avoid schedule delays and optimize workforce efficiency, resulting in substantial cost savings and accelerated project completion.
---

[Case Studies: AI In Construction Projects Case Studies ](https://blog.alicetechnologies.com/case-studies)

# [Top contractor leverages ALICE to mitigate potential schedule delays and drive substantial savings on solar farm project](https://blog.alicetechnologies.com/case-studies/solar-general-contractor-leverages-alice-to-mitigate-potential-schedule-delays-and-drive-substantial-savings)

 Written by [ALICE Technologies](https://blog.alicetechnologies.com/case-studies/author/alice-technologies) | Aug 31, 2022 11:29:00 PM

[View full post](https://blog.alicetechnologies.com/case-studies/solar-general-contractor-leverages-alice-to-mitigate-potential-schedule-delays-and-drive-substantial-savings)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "ALICE Technologies"
  },
  "dateModified" : "2023-08-30T23:28:58.338Z",
  "datePublished" : "2022-08-31T23:29:00Z",
  "headline" : "Top contractor leverages ALICE to mitigate potential schedule delays and drive substantial savings on solar farm project",
  "image" : {
    "@type" : "ImageObject",
    "height" : 720,
    "url" : "https://8469043.fs1.hubspotusercontent-na1.net/hubfs/8469043/solar%20construction.jpeg",
    "width" : 1280
  },
  "mainEntityOfPage" : "https://blog.alicetechnologies.com/case-studies/solar-general-contractor-leverages-alice-to-mitigate-potential-schedule-delays-and-drive-substantial-savings",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Case Studies"
  }
}
```