---
title: Developer Does Concrete Test with the Help of ALICE
description: The developer wanted to understand the impact on construction time and costs if it were to build using quick-set concrete vs. traditional concrete and used ALICE to investigate the optimal solution.
---

[Case Studies: AI In Construction Projects Case Studies ](https://blog.alicetechnologies.com/case-studies)

# [Developer Does Concrete Test with the Help of ALICE](https://blog.alicetechnologies.com/case-studies/quick-set-or-standard-concrete)

 Written by [Test Author](https://blog.alicetechnologies.com/case-studies/author/test-author) | Jan 27, 2021 4:22:53 AM

[View full post](https://blog.alicetechnologies.com/case-studies/quick-set-or-standard-concrete)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Test Author"
  },
  "dateModified" : "2026-01-16T16:29:33.838Z",
  "datePublished" : "2021-01-27T04:22:53Z",
  "headline" : "Developer Does Concrete Test with the Help of ALICE",
  "image" : {
    "@type" : "ImageObject",
    "height" : 1080,
    "url" : "https://8469043.fs1.hubspotusercontent-na1.net/hubfs/8469043/Concrete%20pour.jpeg",
    "width" : 1920
  },
  "mainEntityOfPage" : "https://blog.alicetechnologies.com/case-studies/quick-set-or-standard-concrete",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Case Studies"
  }
}
```