title: Align JV optimizes HS2's Colne Valley viaduct construction sequencing and resources with ALICE
description: With P6 mandated, the schedule had already been built. Align wanted to use the ALICE construction optioneering platform to test its schedule assumptions and look for improvements.
---

[Case Studies: AI In Construction Projects Case Studies ](https://blog.alicetechnologies.com/case-studies)

# [Align JV optimizes HS2's Colne Valley viaduct construction sequencing and resources with ALICE](https://blog.alicetechnologies.com/case-studies/alice-technologies-and-align-jv-partner-on-hs2)

 Written by [ALICE Technologies](https://blog.alicetechnologies.com/case-studies/author/alice-technologies) | Oct 26, 2022 4:54:43 PM

[View full post](https://blog.alicetechnologies.com/case-studies/alice-technologies-and-align-jv-partner-on-hs2)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "ALICE Technologies"
  },
  "dateModified" : "2026-01-16T15:25:33.021Z",
  "datePublished" : "2022-10-26T16:54:43Z",
  "headline" : "Align JV optimizes HS2's Colne Valley viaduct construction sequencing and resources with ALICE",
  "image" : {
    "@type" : "ImageObject",
    "height" : 506,
    "url" : "https://8469043.fs1.hubspotusercontent-na1.net/hubfs/8469043/HS2-VL-10384-CVV_North-Abutment_190801-900x506.jpeg",
    "width" : 900
  },
  "mainEntityOfPage" : "https://blog.alicetechnologies.com/case-studies/alice-technologies-and-align-jv-partner-on-hs2",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Case Studies"
  }
}
```